TR2 Technical Report
Prior to the issuance of a building permit, this technical report must be submitted to the DOB to identify the inspection agency that will perform the concrete testing and inspections. With each inspection, a subsequent TR2 is submitted to the DOB with test results attached.
RTC will complete the Technical Report as part of your order.
Rev. 12/14